AGRULINE rehabilitates transmission main in New Orleans
AGRU's DIPS HDPE pipes used to rehabilitate a transmission main in New Orleans to provide infrastructure for a sustainable future
learn moreAGRU's DIPS HDPE pipes used to rehabilitate a transmission main in New Orleans to provide infrastructure for a sustainable future
learn moreThe Steinaker Service Canal Enclosure project is recognized as the current largest diameter solid wall HDPE pipeline in U.S. history.
learn moreChallenging sewer system fix accomplished using AGRULINE and a record-breaking installation technique.
learn moreThe intake and outfall pipelines for the facility's heat pump were completed in March 2021, using about 800 m of the AGRULINE piping system.
learn moreSince being in service for more than 25 years, the lift station has worked flawlessly with its SureGrip upgrade. Find out more.
learn moreHydroCLICK carries the benefits of HPDE products as well as features for tank rehabilitation, offering enhanced installation times.
learn moreThe mine upgrade is ongoing with about half of the pad complete. The contractor estimates the project is more than a month ahead of schedule.
learn moreThe piping system has provided significant time savings, and will be the largest OD HDPE HDD project in North America.
learn moreThe force main set a record for one of the longest and largest HDD pressurized sewer pipe installations in the world, at 3,100 ft at OD 54.
learn moreIn order to manage landfill closure costs, this city chose a design that included HDPE geomembrane, double-sided geocomposites, and geotextiles.
learn moreThe upgraded WWTP aims to improve operations, increase employee safety, and meet environmental requirements.
learn moreEngineers developed a new method to improve system performance and construction efficiency.
learn moreDue to new regulations, the Huntington, Indiana landfill plan had to incorporate the closure of 60–65 acres of landfill that would be capped. The city selected AGRU Super Gripnet to help close the project.
learn moreThe CRD Wastewater Treatment Project has brought attention to the benefits and practical applications of supersized HDPE plastic pipes.
learn moreThis tailings storage facility, or TSF, in northern Nevada has now selected AGRU MicroSpike geomembrane liner for three phases of its expansion.
learn moreAGRU Sure-Grip and Ultra Grip have been in active use throughout Metro Vancouver’s wastewater treatment and collection system since the 1990s.
learn moreLogistics partners seek specialized containers that guarantee high cost-effectiveness and product quality.
learn moreThe project was completed in a timely manner despite initial challenges. In addition to product familiarity, AGRU geomembrane was chosen due to its close proximity to the project site.
learn moreThe Cortez mine had a need for sustainable water solutions. Their mining operations overwhelmed the current containment system. A design with a significant drainage solution was needed.
learn moreThe Traunsee is considered one of the purest lakes in Austria. To keep it that way, a 47-year-old sewer pipe was replaced by a modern underwater pressure line with the help of products from AGRU.
learn moreThe Gilt Edge mine has been in operation since 1876 as a site for gold ore. Discover how the project saved thanks to the AGRU integrated structured geomembrane.
learn moreThis landfill closure utilized AGRU America’s proprietary Integrated Drainage System (IDS) geomembrane vs. a standard textured LLDPE and geocomposites.
learn moreAGRU PFA GGS sheets were selected as the liner material of an ultra high-purity tank due to its near universal chemical resistance and low leachable content.
learn moreFor a large-diameter, twin-pipe culvert underneath the Spree River in Germany, AGRU PE pipelines with ODs of 1400 mm (55.1 in) and 1200 mm (47.2 in) were installed trenchless.
learn moreLouisa County Landfill Closure Project an inactive 17-acre Municipal Solid Waste Final Closure cover system located in Mineral, VA.
learn moreThe Holcim Cement – CKD Landfill is a 46-acre final closure cover system project located in Catskill, NY.
learn moreThe DWSA, Sand Town Municipal Solid Waste Facility is a completed 4-acre long-term interim cover system located in Sand Town, DL.
learn moreThe Exxon Bayway Refining Company (Exxon) site is situated on approximately 1,300 acres at 1400 Park Avenue, in the city of Linden in Union County, New Jersey.
learn moreAlthough merits of an EGC system existed, it was concluded that an EGC was not a suitable system for final cover at Lanchester, and examined the ClosureTurf with Agru geomembrane product.
learn moreCost (maintenance) and erosion were the driving forces behind using ClosureTurf® at the Vogel facility.
learn moreSWANA awarded Escambia County’s effort to remediate a variety of major issues at Saufley Field Road Construction and Demolition Landfill with the Silver Award for Landfill Remediation.
learn moreBerkeley County Water and Sanitation completed a 10-acre long-term cover system at its landfill site in Moncks Corner, South Carolina.
learn moreThe ClosureTurf® at the Sandy Valley Facility initially was a 2-acre pilot project for Republic Services Inc. evaluation of the ClosureTurf® system.
learn moreSmelter waste was a major issue for this EWS. Ammonia gas generation would kill off vegetation when they would try to vegetate.
learn moreAfter combating nearly a decade of erosion control issues, Tangipahoa Parish Waste Facility of Independence, LA finally found long awaited success in covering the state-owned landfill by installing ClosureTurf®.
learn moreThe soil of the LaSalle-Grant Landfill in central Louisiana was highly erodible, had a high plasticity index, and had a natural pH of 4.0, so its characteristics were not conducive to side slope maintenance.
learn moreDue to its location in a seismic area, concerns over slope stability that could compromise gas collection and containment was a major concern for this landfill.
learn moreThe ongoing challenge at the Pantex Plant was the constant maintenance of the pre-existing cap due to wind and water erosion of the existing landfill cap.
learn moreThe City of Portola landfill was an unlined landfill with highly erosive soils on site causing long term maintenance issues and ground water contamination problems.
learn moreEPA Superfund Site LF-14 at George Air Force Base was closed with HydroTurf® as its landfill closure medium.
learn moreA unique 35-acre landfill closure project that utilized 5 of those acres toward a photovoltaic solar field now capable of powering over 1,000 homes.
learn moreA 30-acre coal refuse pile presented several design challenges including steep slopes, accelerated project schedule, and challenging subgrade characteristics.
learn moreA 66-acre landfill that required a closure system able to fulfill five criteria including environmental, seismic, groundwater, motorist, and local community requirements.
learn more